Flashing & coil guide · 6 min read

Calculate sloped and gable flashing cuts

Build a piece-by-piece cut schedule for a single slope or gable without underestimating blanks at the high point.

01

Treat height as a position along the wall

On a straight slope, flashing height changes steadily from one end to the other. The calculator interpolates the height at both edges of each covered piece so the blank can include the taller edge.

Height at position = start height + (end height − start height) × position ÷ run
02

Handle a peak inside a piece

A gable should be treated as one continuous profile with a left end, peak, and right end. When the peak falls inside a piece rather than on a joint, the required blank must reach the peak height even if both piece edges are lower.

Do not split the gable into two unrelated runs unless the installation actually has a centre seam with its own lap. Doing so can double-count coverage or miss the peak-crossing blank.

03

Label the installation direction

  • Choose a clear start end and keep schedule numbers consistent.
  • Mark each blank with piece number, low edge, high edge, and orientation.
  • Allow for the seam or lap direction required by weather exposure and the assembly.
  • Recheck the field run and peak location before cutting the final pieces.

Put it to work

Use the numbers on your job.

Enter the real field dimensions in the matching UC2 calculator, then verify the result against the actual assembly and applicable requirements.

Open flashing calculator
Next guidePlan laps and waste

Plan carefully. Build to the rules that apply.

These guides and UC2 calculators are planning aids, not engineered designs, permits, product instructions, or code approvals. Verify field conditions, materials, loads, connections, drainage, guards, dimensions, and every other requirement with the governing code, manufacturers, local authority, and qualified professionals for your project.